无标题文档

Solution Service


SUECS is NOT selling products but mainly focusing on providing supporting SERVICE  once client is meeting with a problem and asking for helps whatever at very BEGINNING, DURING or AFTERWARD...  Basically we will study client's needs/inquiries/requirements, and then work out and recommend probable SCS Accredited Products Service Solution for their consideration. Mostly we encourage the BUYER and SELLER to talk their business contract directly, 

and our SUECS will provide necessary 3rd-party supporting services if they are meeting with any difficulties such as Background survey, Technical communicating, On-site Installation & Testing, and Incident/Dispute/Difference handling... in comparison with our worldwide SME Professional Network System.

Mail: business@suecs.com


INDUSTRIAL BOILERS


Since 1986, HUANTONG BOILER (Shaanxi Huantong Standard Boiler Co., Ltd) is engaged to fabricate series of industrial boiler units, pressure vessels and boiler auxiliary equipment as boiler water pretreating, conditioning, deaerating and condensed recovery system. They also provide EPC deign, construction and installation service widely in related industrial & social projects.

COMPANY PROJECT ACTIVITIES

July 7, 2016,Shaanxi HUANGTONG Standard Boiler has delivered its 1st batch of 3 sets of international ordered industrial Boilers since asscoaited with SUECS Industrial Technology. The Figs shows the main body of 3 sets of WNS10-1.25-Q 10T, 1.25MPa Industrial Gas Fuel Steam Boilers and their Auxiliary Equipment Units are readily delivered to Kazakstan after a series of final delivery inspection and testing. 


  


Sept 17, 2016, Shaanxi HUANGTONG Standard Boilers has installed and delivered  WNS10.5-1.25-160/140 Q 10T, 1.25MPa Industrial Gas Fuel Steam Boilers and its Auxiliary Equipment Units to JINGBIAN 969 Natural Gas Production Project of Yanchang Petroluem Oil Field in Jingbian, Yanan of Shaaxi, China. About YANGCHANG Petroluem, please visit: http://english.sxycpc.com/ 




Dec 6, 2016

HUANTONG Boiler success into operation in KAZAKHSTAN these days, President Nazarbayev had visited and made speech on site.

近日环通锅炉在哈萨克斯坦一次试车成功,总统 纳扎尔巴耶夫亲临现场并讲话。





Notes: Typical Non-conformity Findings on Products Fabricating & Supply

1) Repainting or renewed of used mechanical or electrical component parts, such as recovered Valves, Gears or Bearings, Electrical wires or Cables, unqualified plastic or rubber parts;

2) No control on fabricating process such as surface cleaning, painting, lubricating, welding, calibrating & tests.

3) No work SAFETY management, especially with high risk on fire, explosion, safety, health, environmental or people;

4) No local service or spare parts supply;

5) Wrong-used official documents or outdated License Permits;

6) Unaccepted subcontracting risks...